課程搜尋

建築信息模擬經理專業證書課程

培訓項目經理和專業人士以掌握建築信息模擬技術,並滿足其申請建造業議會「建築 信息模擬經理認可」對完成建造業議會認證之有關課程的要求。

   Public Photos / Files - Panel_BIM_Manager2      Public Photos / Files - CITF_Full

建造業創新及科技基金編號: PBT24-005


 

HKD$ 9,800
報名

* 此課程已開課/滿額,請選擇其他課程編號。

HKD$ 9,800
HKD$ 9,800
HKD$ 9,800
HKD$ 9,800

Public Photos / Files - AD_Membership_CN

Public Photos / Files - AD_RegMembership_CN

 

Name of Course

課程名稱

Professional Certificate Course for Building Information Modelling (BIM) Manager

建築信息模擬經理專業證書課程


CITF Code

CITF 編號

PBT24-005


Medium of Instruction

授課語言

Cantonese supplemented with English technical terms

廣東話輔以英文技術用語


Language of Training Material

教材語言

English version

英文版本

Only English version of the computer software is used for teaching in class

本課堂以英文版本的電腦軟件教學


Mode of Attendance

授課形式

Full-time day course 日間課程

09:00-18:00


Duration

授課期

8 hours x 5 sessions

8 小時 x 5 堂


Award of Certificate

證書頒發

1. Completion Certificate

(i) Attended 36 hours or above;

(ii) Completed all continuous assessments

(iii) Completed and passed final assessments

(iv) Obtained 50 marks or above for the programme average.

1. 結業證書

(i) 出席課程 36 小時或以上;

(ii) 完成所有持續評核;

(iii) 完成期末評核及取得合格成績;

(iv) 取得課程平均分 50 分或以上。


Venue

上課地點

Unit 02-03, Level 5, Plaza228, 228 Wan Chai Road, Hong Kong

香港灣仔道 228 號 5 樓 502-503 室


Assessment

評估

Assignment and End Assessment

練習及考核

 

 

BIM Introduction

  • BIM Concept
    • Definitions
    • The difference between 2D CAD, 3D CAD and BIM
    • Concept of BIM as whole project & whole estate perspective
    • BIM benefits and value in whole project & whole estate perspective
    • BIM value for AM & FM
    • Collaborative working in BIM
    • Limitations of BIM
    • Challenges within existing working practices & how BIM addresses them
    • How BIM affects the current practice in AECO industry
  • Local & Global Contexts, BIM standards and guidelines
    • Local BIM standards & resources
    • Global context in BIM development
    • Global BIM standards & resources
    • ISO19650
    • OpenBIM

 


BIM Software and Technologies

  • BIM Software
    • Overview of common BIM software
    • Characteristic, file format, strength and limitation of industry leading BIM software
    • Versions & file formats
    • Interoperability across industry leading BIM software
  • Technologies
    • Internet & cloud
    • Laser scanning & photogrammetry
    • GIS
    • IoT, mobile or smart devices
    • VR/AR/MR
    • VDC
    • RFID
    • Gaming technology in BIM
    • Robotics
    • Programming, automation and API
    • MiC
    • Indoor positioning

 


Digital Information Management, Collaboration and Integration

  • Digital Information Management
    • Values of data & how it should be managed.
    • Interoperate data/information to facilitate cross-disciplinary and cross-BIM platform collaboration.
    • Limitations of BIM softwares in relation to information management.
    • Determine level of development in the context of graphics and information in different stages.
    • Determine level of integration of digital information into asset & facility management.
    • Oversee the process and quality of information exchange
  • Common Data Environment (CDE)
    • Overview of CDE
    • Overview of various CDE platforms in market
    • Setup, assessment & management of CDE
    • Limitation of CDE
  • Data Quality Control & Assurance
    • System checking
    • Model audit
    • Model checking
    • Audit reporting

 


BIM workflow and management at different stages of a project

  • Client BIM Strategic Stage
    • Determine BIM strategies, BIM uses, BIM processes
    • Determine Key personnel in relation to BIM and their roles and responsibilities
    • Determine the information management & CDE strategies
    • Determine BIM/AIM/GIS strategies
    • Determine level of Development in context of graphics and information
    • Determine level of integration of digital information into asset & facility management
    • Case Study
  • Client Pre-tender Project Stage
    • Organizational Information Requirements (OIRs)
    • Asset Information Requirements (AIRs)
    • Employers Information Requirements (EIR)
    • Determine project technology & systems requirement & integration
    • Determine project delivery requirements
    • Determine soft landings approach
    • Contract & consultancy requirements
    • Assessment on supply chain capability & capacity (Tender Assessment)
    • Case study
  • Definition & Design Stage
    • Pre-contract BIM Project Execution Plan
    • Supervision in fulfilling BIM uses in planning & design stages listed in CIC BIM Standards
    • Project Information Model (PIM) data exchanges and validation
    • BIM origin point & orientation set up
    • Model division
    • Modelling methodology
    • Project-based industry and BIM standards
    • Direct BIM related meetings
    • Case Study
  • Construction Stage
    • Pre-contract BIM Project Execution Plan
    • Post-contract BIM Project Execution Plan
    • Supervision in fulfilling BIM uses in construction &handover stages listed in CIC BIM Standards
    • Project Information Model (PIM) data exchanges and validation
    • Direct BIM related meetings
    • Case Study
  • Handover Stage
    • As-built information verification
    • Oversee data transfer from PIM to Asset Information Model (AIM)
    • Supervision in fulfilling BIM uses in handover stage listed in CIC BIM Standards
    • Case study
  • Operation & Maintenance Stage
    • Update Assets Information Model (AIM)
    • Roles, responsibilities and authorities for maintaining the AIM
    • Post occupancy evaluation
    • Case Study

 


Commercial and Contractual Aspects

  • Commercial
    • Establishing BIM ready Environment to support the corporate
    • BIM strategy in organization level
    • Challenges in BIM implementation
    • Phases in BIM implementation
    • Hardware and Software requirements for BIM
    • Manpower management for BIM
    • Staff plan, recruitment & training
    • Promotion of adopting BIM in office/to clients
    • Values and benefits of adopting BIM
    • Values and benefits of data and information from BIM
    • Evaluation of Return on Investments (ROI) of adopting BIM
  • Contractual
    • Ownership of data.
    • Intellectual property rights.
    • Legal implications and potential liabilities.
    • Professional indemnity.
    • Introduction of NEC.
    • Commercial implications for contracts & insurances in relation to BIM

 


Assessment



課程編號 課程日期 期間 時間 費用 學額
CCBM202501 25/04 - 30/05 40小時 / 5節課程 (除 2/5) 09:00 – 18:00 $9800 尚餘少量學額
CCBM202502 13/06 - 11/07 40小時 / 5節課程 09:00 – 18:00 $9800 尚餘少量學額
CCBM202503 25/07 - 22/08 40小時 / 5節課程 09:00 – 18:00 $9800 尚餘少量學額
CCBM202504 05/09 - 10/10 40小時 / 5節課程 (除 3/10) 09:00 – 18:00 $9800 尚餘少量學額
CCBM202505 07/11 - 05/12 40小時 / 5節課程 09:00 – 18:00 $9800 尚餘少量學額

這是建築信息模擬(BIM)經理專業證書課程的結業證書樣本。符合以下要求後即可獲發證書:

  • 出席課程 36 小時或以上; 
  • 完成所有持續評核;

  • 完成期末評核及取得合格成績; 
  • 取得課程平均分 50 分或以上。

 

Self Photos / Files - CCBM_CERT._Sample

建築信息模擬(BIM)經理認證常見問題解答

 

1.BIM 經理認證的對象是誰?

BIM 經理認證的對象是希望獲得建造業議會(CIC)認證為 BIM 經理的 BIM 從業者。

 

2.我是否符合資格申請 BIM 經理認證?

要獲得 BIM 經理認證資格,你必須符合以下要求:

 

(a) 獲得 CIC 認可的專業資格,即香港建築師學會(HKIA)、香港工程師學會(HKIE)或香港測量師學會(HKIS)的正式會員資格;或

獲得 CIC 認可專業團體認可的建築、工程、測量、建造或同等學位,並有 5 年相關學位後工作經驗(其中至少 6 個月在香港工作)。

(b) 在過去 5 年內累積至少 2 年 BIM 實務經驗(其中至少 6 個月在香港工作)。

(c) 成功完成 CIC 認可的 BIM 經理課程,或適用於 CCBC 持有人的 CIC 認可 BIM 經理銜接課程。

新申請者在提交 CIC 認可 BIM 經理課程的完成證書方面有一年寬限期。該寬限期已於 2019 年 12 月 31 日結束。

對於在 2018 年 12 月 31 日或之前已有至少 3 年 BIM 經驗(其中至少 2 年在香港工作)的申請者,可獲得「祖父條款」考慮。這項特別考慮的申請已於 2019 年 12 月 31 日結束。

 

3. 自僱或失業人士可以申請 BIM 經理認證嗎?

可以申請。

 

4.CIC 認證 BIM 經理(CCBM)是否等同於 CIC 認證 BIM 協調員(CCBC)?

CCBM 和 CCBC 是兩個不同的認證資格。由於某些核心能力的要求水平不同,它們不能被視為等同。例如,核心能力 2「BIM 軟件和技術」方面,CCBC 需要達到第 3 級,而 CCBM 只需要達到第 2 級。

 

如需了解更多關於 BIM 經理認證的常見問題,請訪問 CIC 網站:

https://www.bim.cic.hk/zh-hant/certification_and_accreditation/certification_manager_faqs

 


 

建造業創新及科技基金(CITF)常見問題解答

 

1.我想學習BIM,CITF可以如何資助我?資助金額有多少?

透過CITF資助計劃,你可以:

    • 獲得高達70%的課程費用回贈,每個課程最高可獲港幣3,000元或學費70%的資助(以較高者為準)
    • 累積可獲得最高港幣15,000元的培訓資助
    • 這意味著你可以報讀多個課程,直到達到港幣15,000元的資助上限
      例如,一個港幣10,000元的BIM課程,你最終只需支付約港幣3,000元。

 

2.我和我的公司是否符合資格申請CITF資助?

申請資格要求:

 

個人方面:

    • 必須是香港永久性居民
    • 具備相關背景或經驗

 

公司方面:

    • 必須在香港登記
    • 必須為非政府及非受資助機構
      申請過程將由僱主公司協助處理

 

3. 如果想參加EVERBIM的課程並申請CITF資助,需要提前多久報名?審批需要多長時間?

 

可以到下面網站申請和報上課程CITF編號:

https://www.citf.cic.hk/?route=procedure&lang=2

 

報名時間要求:

    • 一般課程需最少提前30天報名
    • 特別定制課程需最少提前8週報名

 

審批時間:

    • 我們大部份課程屬於預先批核名單,審批時間約30個曆日
    • 非預先批核名單的課程則需要60個曆日
      因此,建議優先選擇已獲CITF編號的課程,這樣不但可以確保課程質素,還能更快獲得資助批核。

 

4.如何確保我的CITF資助申請能夠成功?

要提高申請成功率,你可以:

    • 確保選擇CITF認可的培訓課程
    • 提前與僱主溝通,確保及時提交申請
    • 準備好相關的背景資料和經驗證明
    • 遵循申請時間表,預留足夠的處理時間

 

如需了解更多關於建造業創新及科技基金(CITF)的常見問題,請訪問 CITF 網站:

https://www.citf.cic.hk/?route=home&lang=2

 


 

報名流程:

  1. 請在網站上選擇合適的「課程編號」,然後點擊「報名」按鈕。
  2. 學員可透過「銀行轉帳」方式完成註冊付款程序。
  3. 完成付款後,請將以下資料電郵至 info@everbim.com.hk
    • 付款證明圖片
    • 姓名
    • 聯絡電話
  4. 本公司確認收到款項後,將發送確認電郵給您。
     

    溫馨提示:

    • 確認電郵中將附有您的專屬QR碼,此碼用於課堂點名,上課時請務必攜帶。
    • 請於報名後3天內完成付款程序。
    • 如有任何疑問,歡迎致電 (852) 3797 5793 查詢。 

學員可透過「銀行轉帳」方式完成註冊付款程序。本中心收到款項後,將以電子郵件通知確認您的報名。